Better Treatment Starts With the Right Understanding.

C-Water approaches wastewater as both a treatment challenge and an operational system — characterisation, pretreatment, filtration, chemical treatment, control, monitoring and optimisation.

01Why It Matters

Wastewater

Effluent treatment is the part of a plant most often designed for a load that no longer exists. Production changes, product mixes shift, and a plant built for a steady average finds itself handling a variable peak. The result is usually chemical overdosing to stay compliant, because the alternative is a discharge that is not.

02Common Problems

What Goes Wrong.

  • Unknown load

    Without a current characterisation, treatment is designed against an assumption. Load varies by shift, product and season.

  • Suspended solids and oil

    Solids and free oil overload downstream stages that were never intended to remove them.

  • Chemical overconsumption

    Coagulant and polymer dosed to worst-case load costs continuously, even when the actual load is well below it.

  • Discharge compliance

    Consent limits are checked at a point in time; a treatment system has to hold them across every operating condition.

  • Sludge handling

    Volume and dewaterability are decided by the chemistry chosen upstream, and are often the largest running cost.

03Operational Risks

What It Costs the Operation.

Regulatory exposure

A non-compliant discharge is a reportable event with consequences beyond the treatment plant.

Operating cost

Chemical, energy and sludge disposal together usually exceed the capital cost within a few years.

Production constraint

When effluent capacity is the bottleneck, it limits what the plant can produce.

04The C-Water Approach

How We Work the Problem.

  1. 01

    Characterise

    Composite and grab sampling across real operating conditions, including the shifts and products that produce the peaks.

  2. 02

    Pretreat

    Screening, separation and flotation remove the load that would otherwise be treated chemically at higher cost.

  3. 03

    Treat

    Coagulant and polymer selected by jar testing against the actual effluent, not by general specification.

  4. 04

    Control

    Dosing driven by measured load lets chemical consumption follow the plant rather than its worst day.

  5. 05

    Monitor

    Continuous measurement at the discharge point provides both compliance evidence and early warning.

05Technology Stack

The System, Stage by Stage.

Each stage changes what the next one has to deal with. This is the sequence C-Water engineers around.

  1. 01

    Influent

    Load characterised

  2. 02

    Screening

    Coarse solids out

    TIMEX
  3. 03

    Flotation / Separation

    Oil and fines removed

    TIMEX
  4. 04

    Chemical Treatment

    Coagulation and floc

    Kurita Europe
  5. 05

    Dosing Control

    Follows load

    Walchem
  6. 06

    Polishing

    To consent limit

  7. 07

    Discharge / Reuse

    Monitored

Let’s Talk About Your System.

Tell us the operating conditions and what you are seeing. We will confirm the water chemistry before recommending anything.